Do you record the pipe material and diameter alongside each finding?
I'm putting together a simple logging sheet for sewer camera work. Right now I note the footage, the issue, and a still image, but I keep wondering if I should add pipe material and diameter to every entry or just the summary. For those who do this regularly, do you record material and diameter alongside each finding? If so, how do you handle unknowns when the camera can't confirm it?
I record diameter at the start of each run and material only when I can see it clearly. Guessing PVC versus clay leads to bad notes later.
Every finding gets the diameter. Material goes in the header unless there's a transition. Transitions are where people get lazy and then nobody knows which side of the line the defect is on.
What counts as a finding? A crack, root intrusion, offset? I log diameter per segment and material per segment, not per individual defect. Otherwise the sheet gets unreadable.
By finding I mean anything I'd flag: crack, root mass, offset joint, bellied section. I'm trying to avoid a sheet where every line repeats the same diameter.
Unknowns are normal. I put unconfirmed and add what the camera showed, like smooth white interior or rough orange-brown. Better than leaving it blank.
We only do diameter in the report header. The video and photos show the material well enough most of the time. Adding it to every entry is duplicate work.
Photos don't always show scale. Diameter next to the defect saves arguments when the customer says the wrong pipe was inspected.
I don't record material at all unless it changes the recommendation. If it's a clay pipe with roots versus PVC with a break, that matters. Otherwise diameter is enough for locating the defect.
How do you handle lined pipes? We see a lot of CIPP and the camera can't always tell original material. I note lined, original unknown and the diameter of the liner.
This is probably overthinking it for residential work. Note the size, note what you see, take good stills. The next guy can figure out the rest.
That works until you hand off a 300 ft run with three transitions and no mateRial notes. Then the next guy is guessing.
Dropdowns sound nice, but half the field techs will pick the first option just to move on. I'd rather have a short free-text note than bad structured data.
Post a reply
Trending Discussions
- Has anyone had to replace the push cable on a VEVOR sewer camera? 11 replies
- Which budget models would you avoid? 10 replies
- Is the VEVOR crawler worth buying instead of a long push camera? 14 replies
- Are DVR units interchangeable between different inspection systems? 11 replies
- Does the camera head matter more than the recorder when it comes to video quality? 14 replies